Plant Equpment Installation

Khalifa University

Design, fabrication and installation of plant to handle bitumen coating on DI pipes from size 500 to 1200 mm dia. In 15 days

  • Plant layout design to handle 6.3 m pipe in 20” to 36” diameter.
  • Gantry design & fabricator – 60 meters
  • Shed design & installation.
  • Bitumen coating station with pipe rotating station.
  • Commissioning and handing over.

Customer: Al Nakheel hygiene tissue paper. Tissue roll handling extension in converting hall

  • Mechanical erection and assembly of shuttle installation parts
  • Electrical wirings
  • Alignment and levelling
  • Grouting

Supply, fabrication and installation of pipeline network to meet new PET bottling line

  • Steam pipeline in CS
  • HP compressed air line SS304
  • LP compressed air line SS304
  • Steel platforms
  • CIP pipeline SS316
  • SS Trolley, cabinets, rejection trays

Rigging & installation of injection molding machine

  • Rigging & installation of Husky PET equipment
  • Skilled technicians provided in Mechanical and electrical for integration

Design & installation of test lab setup

    • Structural work – Lab wall, doors, ramps, & Monorail
    • Lab walls in 20mm steel plate, mineral wool & RCC
    • Compressed air line & compressor shed
    • Water line, drainage line
    • Lab room
    • Industrial wiring for equipment and lighting connection

Rigging & installation of injection molding machine

Project:

  • Cooling tower support structure frame.
  • Transformer maintenance system.
  • Makeup water tank structure for cooling tower.
  • Acoustic Doors for DG sets.
  • Design
  • Engineering Analysis
  • Supply
  • Installation