NOV Tuboscope

OUR SCOPE

  • ROVA provided services to NOV Tuboscope Wellbore Technologies to set up “New Coating Plant” at Abu Dhabi, UAE and Dammam, KSA. Wellbore Technologies is part of NOV Tuboscope, which develops the equipment, technologies, and services for downhole drill heads and bits refurbishment and coating.             
  • The plant main equipment such as pre-bake ovens, six-lance blast machines, end blast machines, primer coating, powder coating, curing oven, pipe handling racks are installed by our technicians. All utilities – compressed air pipeline, vacuum pipes, gas connections are fabricated and installed as per layout. Other additional plant equipment such as dust collector, compressors, air receivers, booster pumps and cooling towers were installed around the plant. Accessories such as blast hopper, bucket conveyors, screw conveyors, steel platforms, oven cart, scissor lift, air manifold, end stoppers, holiday cart stand, cart rail were installed.
  • Exhaust stacks fabricated in SS sheet along with ceramic insulation for pre-bake oven. Oven insulation made with ceramic wool. Large diameter ducting from blast machine are pre-fabricated in workshop and site installed with supports to dust collectors. All power electrical installation made including panel wiring, dressing, cable laying are supported by electricians till commissioning.

OUR SCOPE

  • ROVA is tied with Reactive Downhole Tools in setting up plant for making packer to seal in the irregular fractures along the length of the wellbore.
  • The important equipment installation were steam generator, auto-clave, lathe, packer, cranes, blasting booth, pipe rack and transfer rack. Fabrication and installation of Entire utilities -compressed air, gas, steam, potable water piping is done by our technicians including engineering and optimizing cost. The exhaust stack is made in piece of SS rolled with insulation. The electrification of entire factory is achieved according to the local regulations in shortest time.
  • We were able to do the certification of LPG tank, extending lathe extension, conversion of CNG to LPG for steam generator. Optimizing lighting inside factory shed. Small fabrications for calendar cart, rubber cat for unpacker was also done to save time.

Installation of Electrical panel & cooling products for :

  • ADNOC
  • SAUDI ARAMCO,
  • QATAR PETROLEUM,
  • KUWAIT NATIONAL OIL COMPANY

For Off Shore and On Shore projects.

OUR SCOPE

  • Setting up entire product refurbishment line including blasting and coatingInstallation & Rigging.
  • Your requirements may lie on our specialist areas of completions and commissioning, operational readiness, or specialist inspections. Or they may be more general engineering requirements
  • We at ROVA Industrial Supply & Service produce high pressure joints which are qualified for X-ray testing.
  • We Supply Highly skilled Technicians for job specific requirement such as Fabricator, Welder, Fitters and Electricians.

OUR SCOPE

  • In 2019, ROVA engaged with Weir Oil & Gas Abu Dhabi (WESCO) to fulfil their requirement of automation of large diameter pipe socket and spigot piece welding which are used in platform legs.
  • The entire plant was set in record time from concept to execution.
  • We setup, column and boom along with SAW welding for pipe to socket and spigot
  • Pipe transfer trolley design in low voltage DC was implemented.
  • Pipe racks, compressor piping ad